Hammer NU Blue

49,95 inc. Tax

Size Chart Polo, Jersey, T-Shirt
How to measure

Production time: 3-6 weeks, Shipping time look here

Description

Please note, this product has no right of return, it is made especially for you, explains also the longer delivery time.
Products are produced to order, hand-sewn and of highest quality

Properties of the material:

  • Textile: 100% polyester
  • quick dry eyelet mesh fabric 140gms
  • Absorbs moisture quickly
  • Short drying time
  • Breathable
  • Washable at 30°C
  • Regular fit
  • UV protection
  • Side seams
  • Set-in sleeve design with 3 button placket
  • Self-coloured buttons
  • Twin needle stitching detail

Shirt Types

Size Chart

How do i Measure?

Font-types-name

 

Washing:

  • Wash uniform inside out to aid in damage prevention from other items in load
  • Wash colored and white garments separately
  • Use cold/warm water
  • Use a mild soap or detergent
  • Remove garments from washer promptly

Drying:

  • Hang dry on wooden or plastic hangers (strongly recommended)
  • If machine dried, set for AIR or Low heat ONLY
  • Remove promptly when cycle is completed

DO NOT:

  • DO NOT use metal hangers, they may leave rust marks
  • DO NOT wash in hot water
  • DO NOT iron
  • DO NOT over load washer/dryer
  • DO NOT dry clean
  • DO NOT use chlorine bleach or a bleach substitute
  • DO NOT use a fabric softener, i.e. Downy, Woolite, on MXS Moisture – Management Garments – it reduces wicking properties

Storage:

  • Dry uniforms completely before storing
  • Store in a dry, cool area

After you place your order you will receive your invoice. Once you order is paid, your shirt will move to printing.
Production for the shirts takes 3-4 weeks. All shirts are shipped from our Dutch location through PostnL or DHL.

natural colors of designs may vary slightly from the pictures which will be displayed in the monitor, because the resolution of the monitor.